Five disciplines, one crew that masters all of them. Below, per service: what we do, up to which ratings, and what you are handed at completion.

Low-voltage busbar with crimped cable lugs and green-yellow earth conductors.Power

Main distribution boards

Distribution boards and busbar systems for industry and utilities. Lugs crimped, torqued to spec and marked per connection.

  • Up to 4000 A
  • Busbar systems & boards
  • Phases labelled L1 / L2 / L3
Distribution cabinet with complete cabling in blue, brown, black and grey.Light & power

Lighting and power installations

Complete installations for commercial and production buildings: power circuits, lighting, emergency lighting and all the cabling between.

  • 230 / 400 V
  • Power circuits & distribution
  • Emergency lighting
DC combiner with fuses and AC main switch inside a storage cabinet.Storage

Battery storage

Connection and protection of battery systems: DC combiners, inverters and the tie-in to your main distribution.

  • 5 – 250 kWh
  • AC- and DC-coupled
  • Peak shaving & backup
Supply cabinet with bars marked U, V, W and N and heavy connection cables.Charging

Charging infrastructure

From a single charge point to a fleet hub: the supply, the distribution and the metering underneath — that is where the real work sits.

  • 11 – 400 kW
  • Dynamic load balancing
  • MID-certified metering
Engineer working inside a distribution cabinet, in high-visibility clothing.Service

Service & maintenance

Periodic inspection, thermography and a breakdown service. We know your installation because we built it.

  • NEN 3140 inspection
  • Thermography
  • Breakdown service

Net metering ends 1 January 2027

Your surplus will be worth half. Unless you store it.

From 2027 the Dutch net-metering scheme ends; during the transition a statutory minimum feed-in tariff of 50 % of the bare supply rate applies. At the same time the grid is filling up. Storage moves your midday surplus to the evening peak — and keeps your connection out of congestion.

72kWh surplus between 9am and 3pm78 %self-consumption with 60 kWh storage≥50 %statutory feed-in tariff from 2027
+20 kW0−20 kW00:0004:0008:0012:0016:0020:00
Surplus to battery
Drawn from battery
Drawn from grid

Example: 30 kWp commercial roof with 60 kWh storage, a working day in May. Illustrative values — we measure your own profile during intake.

Open price indication

We break the price apart before you have to ask.

“Contact us for a price” is not an answer. This is what a typical home battery costs with us, line by line — including what is not in it.

This example is hypothetical. What you actually pay depends on the job itself — what is already there, what has to be replaced, how the cable runs — and on the travel distance to your site. A binding figure follows the intake, in writing.

Indication — 15 kWh home battery, AC-coupled, three-phase · amounts excl. VAT
ItemAmount
Battery system 15 kWh (LFP)Brand TODO_MERK · 10-year manufacturer warranty€6,400
Inverter / AC couplingThree-phase, 10 kW, with backup changeover€1,250
Installation materialsCable 5×6 mm², board extension, type 2 surge protection€780
Labour2 engineers × 1.5 days, travel included€1,560
NEN 1010 inspection + test reportInsulation resistance, Zs, RCD trip time€320
Subtotal€10,310
ISDE subsidy (indicative)We file the application; RVO pays it out-€1,850
Indicative total€8,460

This is an indication based on earlier projects, not a quotation. Not included: connection upgrade, consumer-unit replacement, chasing and breaking work, and additional work found on inspection.

Tell us what you need. A substantiated quote lands within two working days.